In November 2016, DDOT completed Preliminary Design Plans for the extension of the Metropolitan Branch Trail in two sections; from Brookland to Fort Totten, and from Fort Totten to Takoma. Take a look at the preliminary design plans at the links below.
Preliminary Design Plans for the Metropolitan Branch Trail – Brookland to Fort Totten Section
Preliminary Design Plans for the Metropolitan Branch Trail – Fort Totten to Takoma Section
Leave a Reply