Eastern Avenue Segment

The District Department of Transportation has completed design plans for the one block section of the Metropolitan Branch Trail (MBT) from Piney Branch Rd NW to the Maryland Line along Eastern Avenue. The trail will connect to the existing MBT in the City of Takoma Park.

The trail will include green infrastructure features including permeable asphalt and a bioretention facility that will reduce stormwater runoff. The trail will include new lighting and traffic calming curb extensions. The ten foot wide walking and biking trail will replace the existing sidewalk and curbside lane of unregulated street parking for that one block.

DDOT plans to construct this project later this fall following the completion of the ongoing PEPCO Takoma to Sligo Underground project, which is currently taking place in the same area. A copy of the trail design plans are available here:
Met Branch Trail Eastern Ave Color Trail Plans

A summary of the project is available here:
Met Branch Trail Eastern Ave Summary

If you have any comments or questions about the proposed design, please contact:
Michael Alvino
Bicycle Program Specialist
Planning and Sustainability Division
District Department of Transportation
michael.alvino@dc.gov.

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>