Year: 2010

11/01/2010

The Environmental Assessment (EA) required to continue the sections of the Met Branch Trail from Fort Totten to Takoma (and including the Prince George’s Connector) is now available for public comment. Click here to review and send your comments (which must be submitted by Dec. 15, 2010).

05/03/2010

The trail is now open from Franklin Street to New York Ave. with access points to neighborhoods at Franklin Street, the Rhode Island Ave. Shopping Center, T, S, Randolph and R Streets. A new park at S Street provides a place to lock up your bike, sit on a bench or picnic on the lawn [Continue]

03/29/2010

Almost complete! The section of the MBT currently under construction (New York Ave. to Franklin Street) is scheduled to be completed by the first of May. Large retaining walls needed due to steep slopes are being finished and the trail between R Street and New York Ave. is being graded and surfaced (a WMATA easement [Continue]